It started with 6 assorted CP power units coming into view, given away by the sheer noise of these units even this far down the valley. It stops to wait as a shorter CP unit speeds by westbound on the southern track, then proceeds down the North Toronto Subdivision in prep to drop off a set of hoppers in the yard. The consist was pretty mixed with some covered vehicle carriers, assorted tankers, the hoppers, some engineering and MOW units, and at the very back a GO unit probably used as a makeshift caboose for housing maintenance crews.
JayJr2007 grabbed some footage of a GO unit at the end of a CP freight consist in Parry Sound on November 29, likely the same unit, and again it appears in Lambton Yard on December 2 in my clip of the CP Holiday Train.
Lots of noise in this one as the cars rattle about while being positioned in Leaside. I wasn't going to get any power unit numbers unless I was carrying binoculars with me but it looked like an interesting assortment.
After seeing the initial action from the valley,I scooted up to the crossing at Bayview to get a little closer and better sound. After about 20 minutes or so it was getting fairly chilly standing on the hill in shorts and a couple of shirts so it was time to get moving again. Back in the trails of Crother's Woods I caught the end of the consist with the GO unit heading west and the hoppers left behind in Leaside.
No comments:
Post a Comment